Showing posts with label renovation. Show all posts
Showing posts with label renovation. Show all posts

Tuesday, February 17, 2009

Seven Years Bad Luck?

Ontario's 2nd annual Family Day was used to get our "family" bathroom done. After grouting the tiles on Sunday, we were ready to install the sink, then toilet. This took some time, but was pretty successful. We did have to call the plumber to ask how to remove the cap on the toilet (water closet) flange. We thought that it would just pull out, but instead we had to smash it out with a hammer and screw driver. In all my reading on how to install a toilet, I never read anything about that. Thankfully our plumber is never far from his cell phone and quickly lead us in the right direction. After an 11th hour trip to Candian Tire (on a holiday) to buy longer w.c. bolts, then stacking up two flange extenders, the dual flush water efficient toilet was easily installed.

Time for the finishing touches. We were finally ready to install our fancy mirrored medicine cabinet. When following along with the instructions, ready to put hinges on the door, we discovered a devastating crack on the inside corner (lower right corner in the photo). ARGH! Does this mean 7 years bad luck if we didn't break the mirror? It has been in the box since we bought it, nestled in its protective styrofoam corners, so I don't know how we could have broken it. But the downside is that we bought it a few months ago, waiting for this moment. We've contacted the distributor and are waiting to see if they'll replace the door. Otherwise, this could be an expensive setback. Fingers crossed that this will be resolved soon, and we can declare this bathroom done!

Sunday, February 15, 2009

Prefinished vs. unfinished hardwood floors?

The last major part of this job is the floor in the hallway and 3rd bedroom. A week ago, it was exposed plywood, about 3/4" below the other floors. I had planned to buy some flooring and install it ourselves, but we never found the narrow hardwood flooring at the DIY stores. Our friends at Home Hardware actually carry the 1 3/8" red oak strip flooring, but we learned that they don't display it, because apparently, nobody wants it. Why, I wondered.

We learned from one of our tile quotes that the strip flooring comes unfinished, so after installing it, you have to rent a floor sander and sand it, apply two coats of polyurethane, a fine sand, and then a third coat of polyeurethane. Very labour intensive, smelly and messy. But the alternative was prefinished flooring that is 1" wider and won't be an exact match to the exisiting hallway. So we had three hardwood experts come in to give us quotes and ideas, and in the end, we decided to replace the exisiting hallway so we could take care of some excessive squeaking, and have a perfectly matched hallway. We decided that while we're at it, we should also refinish the bedrooms.

Easily said, but not that easy to do, as we had to move everything off the 2nd floor and then leave the house for a week. But is it a renovation without some pain and sacrifice? I think not. (Remember the four months of showering at the Y? I do!) Our only saving grace was the 25 square feet of space in the bathroom, so we packed it full of shelves, books, dressers, desks, bedside tables. mirrors, clothes, bedding, etc etc etc. The rest had to be moved downstairs, creating plenty of opportunity to scratch the walls. With a suitcase, our laptops, and all the dairy from the fridge, we took refuge at a comfy home on Gladstone for the week. Their floors were refinished by the same guys about 5 years ago, so we had plenty of time to admire the work, and dream of how nice our home will be.

On Saturday morning, we could see our reflections in the beautiful shining oak floors. We spent the day moving furniture back to its functional places, while desperately trying not to scratch the new floors. Now we must tread lightly and be careful not to slip on the highly slippery floors, while painting, installing trim, and more painting. Honestly, the fun never ends.

I would recommend our contractors, Peter and Bill at Beach Hardwood Flooring: (416) 699-2113. Courteous, knowledgeable and reliable, but they're a bit camera shy.

Saturday, February 7, 2009

Is that the finish line I see, or is it just another mirage?

Oh, we are so close to finishing this lengthy renovation. There are only a few things standing in the way of a fully fuctional four piece bathroom on our 2nd floor. But the long list of "little" things are taking forever and I feel like we'll never be done!

I made a huge mistake last week. I told RoboMike (a.k.a. the Tile Fairy) that I didn't need his help finishing up the tile and trim. I figured that he didn't need to drive 73km on his day off when I have a hammer of my own. So off we went to our local Home Hardware and picked out some trim. But in one day, all that I accomplished was some priming of trim, installing a lockset on the pocket door, and hanging the pocket door. I also did tons of analyzing/worrying about how the trim should be installed, referring to my latest library book. For somebody with experience, I'm sure this is a very easy job. My father tells me that my late Uncle Wally, a carpenter by trade, could trim a whole house in one day. I can't even do a tiny bathroom in one day. 

Anyway, I didn't fully regret my decision until the next day at my niece's birthday party when RoboMike continuously teased me about "firing" him. If I'd known that he has such a deep desire to escape life with my sister for a day in exchange for some thankless hard labour at my house, I wouldn't have stolen his dream. So now I felt bad for not getting the work done myself, and for taking this joy away from a man who doesn't like to relax.

But I digress. I decided to turn up the heat and get this job done myself. So for one week, I have been leaving work promptly at 5 p.m. and changing into my work clothes and getting right to it. I nailed the baseboard trim, put up the door jams for the pocket door, and filled the countersunk holes. The next night, I put the trim around the door and window. It is important to point out that I only have a cheap plastic mitre box with handsaw that somebody leant us 2 years ago, so that slowed me down a bit. I also used the mitre box with our cheap hacksaw to cut the metal tile trim for the sink backsplash. Dan came to admire my work at 9 p.m. after his French class, and I suggested that we tile the backsplash. He didn't really agree, but next thing I knew, he was mixing up the thinset with a stick and I was slapping the tiles up (and then franticly putting tile spacers in to keep them from sliding together). The area is only 27" x 10", so how long will that take, right? Well, as it turns out, it takes a bit more time than I thought, but much less thinset. (Oops. We've got about an extra 4 litres here just hardening in a bucket.) But, the bottom line is that the tiles are up and the trim is now painted, and we are ready to move onto the next task in this fun renovation.

If I squint hard, I can see the finish line on the horizon.  (Or, is that my tired eyes blurring the glass mosaic tile into a checkered flag?) When I drive down Toronto's Lakeshore boulevard, I always flashback to those last few kilometers of the first half marathon that I ran. I can remember the exact point on the road when I had that thought: "what the hell am I doing here". Every step after that became increasingly difficult. But as I turned away from the lake and ran towards the CN Tower, I could hear the people cheering at the finish line, and I just pretended that they were all cheering for me. And those last 500m were the best, because then I was done! I have only ran past that spot one other time, when I reapeated the half marathon the following year, and I had the exact same reaction. So, while I hope that this is my last bathroom renovation, I have a bad feeling that in a few months, I'll forget the pain that I'm feeling right now and get myself into this mess again. But hopefully only one more time.


Wednesday, January 28, 2009

Can we really renovate our way out of recession?

The sight of Prime Minister Stephen Harper on the evening news in casual attire using a nail gun looked as awkard as me wearing heels. This publicity stunt caught my attention, and I had to find out more. 

Touted as temporary, timely and targeted stimulus, The Conservative government's proposed Home Renovation Tax Credit came a few months too late for me! Sadly, this tax break for home renovations is NOT retroactive to Jan. 1, so I can't claim a credit for the tile work done last week, nor for all the materials I have purchased over the past few months. It is too bad because the total is nearing the HRTC limit of $10,000, which would have given me a healthy $1,350 tax credit (which could have been spent on even more renovations). This is one of the rare times that procrastination would have paid off, literally. But we had just started smashing out the floor tiles when we witnessed the first of many big crashes on the world stock markets. We could have put the renovation on hold, covering the plywood subfloor with a nice big bathmat, but I joked that my spending may stimulate the economy. And despite going over budget on this reno, one little home was not enough. So people, get out there and get renovating.

Or should we save? Am I the only one who finds it ironic that this is the same government that launched a massive plan just under a year ago to encourage Canadians to save? The Tax Free Savings Account (TFSA) is promoted as tax-free money for what matters to you. Every year, Canadains can put up to $5,000 in a registered TFSA account and the gains will be tax free and there is no penalty for withdrawls. But from what I understand, this intitiative was only created to make up for the Conversative's broken campaign promise to adjust the capital gains tax. I don't think that they really care that Canadians today have the lowest personal savings rate of all time. The airwaves (and cyberspace) are littered with ads for the TFSA, either from the government or from all the banks lobbying hard to have you open your account with them. Some say that "it's worth talk". And I guess that it is good for the banks to have something good to talk about these days, when all their news of late is full of doom and gloom. Although, I can't help thinking that if I'd had this TFSA last year, maybe I really would be "richer than I think".

Both these programs remind me of when the Conservative's canceled the EnerGuide for Houses program. We were midaway through the program to make our home more energry efficient in exchange for expert advice and a small grant. Harper's cancellation made us rush our energy efficient retrofit work, from 18 months to only 8, without any guarantee that there'd be enought money left in the program to pay out the promised grant. It was a real disappointment. But when Harper launched his new program, it was vaugely similar, but rebranded with the media friendly prefix "Eco" in the title. 

So, the question remains: what should I do with all my extra money? Should I save it in last year's budget surprise: the TFSA. Or should I get myself a nail gun and continue stimulating the economy? Or should I say screw it all, and jump on the next plane to Costa Rica? Pura Vida, amigos!

Sunday, January 25, 2009

Welcome to Command Central

I write to you from the warm travertine floor of my new bathroom. I have to sit here to enjoy the heat and admire control central. Today I wired up the floor heating to see if it would work. It is pessimistic to think that it wouldn't, but all the warnings in the package and the fact that the only friend I know who had floor heating installed found that it didn't work after the tile was finished. Hers had to be removed and replaced.

Last week, we chose to call in a pro to finish the floors. I was hoping to find somebody to do both the tiles in the bathroom and the hardwood in the hallway & back room. We had two contractors who were willing to do both jobs, but neither had a wet saw, so had to rent one, and neither had experience working with the traditional strip oak flooring currently in our home. The third contractor did tile only, and were not fazed by the travertine nor the NuHeat floor heating mat. They were my favorite already, but I had to wait for the quotes. In the end, they had the bathroom, but we had to find somebody else to do the hardwood.
We agreed on a price Thursday and they came the next day to do the scratch coat. This consisted of metal mesh covered with shiny mortar and took less than an hour. The following day, they came to do the drypack and level the floor. This is when they imbeded the floor heating mat. This needed to dry for a few days, but they were back on Tuesday to lay the tile. Wednesday they returned to grout. A finished floor in less than a week. Incredible!

But, then came the waiting. Three days and we could seal the tile. On the appointed day, I painted the walls, and then did one coat of tile sealer. A second coat of sealer today, and "light traffic" is permitted 4 hours later.

We wanted to install the baseboard trim before putting in the toilet, but sadly the paint can says we need to wait TWO WEEKS before gluing on trim. So, more waiting. (Please note: I was intending to glue and nail the trim, but have since been adviced to only nail after committing my intentions to print. Thanks to my readers!)

Feast your eyes on this beautiful sight! Tiled floor, a mirror in the vanity cutout, and our sink/vanity in place. Now, just imagine the luxury of the 31C floor temperature contrasted against the -22C temperature outside (with the windchill factor). My command central has a backlight overhead light switch, a timer for the exhaust fan, and a programmable termostat for the floor heat. And best part -- it works.

Saturday, January 10, 2009

The waiting is the hardest part

Tom Petty may have beat me to this phrase, but honestly, the waiting can be the hardest part. Months in the making, we thought that after the grout went in, that we'd be showering at home in a matter of days. But, the grout sealer bottle said to let the grout cure for 10 days before sealing. Everybody in my network thought that seemed like a long time, but when you've gone to this much effort, what is a few more days? Or 10?

So, we waited. And worked on figuring out how to get the floors finished. My part time tiler/brother-in-law refused to work with the travertine we'd selected and the floor heating mat. Who could blame him? I thought about doing it ourselves, but after checking out the large wet saw at the rental department of Home Hardware which rents for $78/day, I thought twice. I had visions of us trying to cut the 12" x 24" tiles on our front porch in the -24C weather with all our neighbours watching (and laughing). So, at the end of the year, I decided to call in a few pros and speed up this outrageously long bathroom reno. Right now we're waiting for quotes from our three selected contractors, recommended by our friends Max and Tino at Home Hardware.

Yesterday my tiler/brother-in-law called to say that he was coming to caulk the tub area. I wanted to do it myself, but like the grout, he said no way! Who am I to argue. Again, after the months of work to get to this point, I'm happy to have him do it. So last night, Dan and I poured out some toxic grout sealer and applied it with some sponge brushes to all the grout lines. Twice.

Mike has just finished caulking and in 24 hours, we can use our shower and tub. Hooray. This is a huge victory worth celebrating. And since I didn't do much of the work for this part of the reno, waiting really was the hardest part. But now, showering at home will be my reward!

Thanks again to Mike for all his amazing work. The shower looks amazing! I can't wait to have my victory bath tomorrow.

Tuesday, December 16, 2008

The tile fairy

When I was at work today, the tile fairy came to visit, and did a mighty fine job on the tub surround. Thanks Mike!

I have to say that choosing the tile is mighty stressful. It exceeds the indecision and worry of choosing the kitchen counter top. I have a hard time seeing how the tile will look in the finished space. I love glass mosaic tile, but thought that it would be too much for the whole tub surround. So we decided to go with the basic subway tile - clean and classic. But just last night, we ran over to see Tino at Home Hardware, and to see some glass mosaic tiles. I was thinking of the Aqua (blue) mix, whereas Dan was thinking of the Seaglass (green) mix, but we both agreed that the Coco mix would be prefect to tie in the Espresso vanity (that is currently in our dining room) and the Travertine stone floor (which is currently in our spare bedroom). The tile fairy has a bit more work to do, but soon we may be showering in our own home again. Maybe before the year is out. Maybe. But the YMCA is open 365 days of the year, so a shower is always close to home, just like Home Hardware!

With this tile (in)decision settled, next up is the paint colour. Fun times. Where is Peter Fallico and his design team, when we really need them?

Monday, December 8, 2008

Help is close to home

Everybody is talking about the 100 mile diet and shopping local, but the parking lot at the big box store is always full. And why? You can rarely find anybody to help you and delivery is a whopping $75. But, if you shop local, these happy men in red shirts are always there to help. They are full of knowledge, always friendly, and they speak Portuguese!

We have purchased the majority of our bathroom fixtures, tiles, lumber, drywall, etc. from our local Home Hardware: Downtown Lumber on Ossignton Ave. (across the street from the trendy and delicious, Foxley). They are the largest supplier of tile & stone in downtown Toronto, and their prices are as good or better than all the other places we've been. They have free parking in the back (2 or 3 spaces), delivery is only $25, and I can ride my bike over there in minutes, plus they give you Aeorplan points! It sure beats a Saturday in traffic to get up to the Junction. Maybe one day we'll convert this costly renovation into a trip.

I love old hardware stores, where the shelves go up to the ceiling with stock, and they have those long sticks to get stuff down. Not the best place for browsing, but honestly, they have it all if you're not afraid to ask. Plus, they can always have great advice. Call Max and Tino, the bathroom and kitchen specialists. When I call, they recognize my voice now, which is a bit embarassing. But if I had a kid, I'd ask them to be the god fathers because they are that good.

Thanks guys. It is nice to have help so close to home.

Sunday, November 16, 2008

(Some) Drywall is up!

Wow. I thought that the framing looked good, but now that all the vapor barrier is up and some of the drywall boards are up -- it is looking like a real room (actually, two rooms)! Yesterday we had a hired gun come to hang drywall with us. Dave is a skilled and experienced drywaller/handyman, but he is also a talented singer/songwriter in the Toronto band, The Warped 45s.

Dan woke up in the night with chills and sweats -- not good. So I got up at 7 a.m. to pull all the insulation out of the ceiling - again - because I put in too much. I replaced it with an adequate air space and started with the vapor barrier. The 22 sheets of 4' x 8' drywall arrived around 8:30 a.m. And Dave arrived right on time at 10 a.m. With Dan out of commission, it was just the two of us, and we finished up the vapor barrier and then started hanging sheets on the ceiling. My friend Chris very kindly offered to come and help out, standing in for Dan. It was great to have an extra pair of hands for the ceiling.

I learned a lot from Dave. He seemed to think that I knew more about drywalling than I really do, but since I'm good at faking it, it seemed to work out. We finished most of the ceiling and all the tub surround. At the 12 hour mark, I called it quits.

This morning I woke up with blisters on my drilling hand but a desire to keep going. Dan recovered from his 24 hour flu and together we attacked the most challenging board first. This one had six cutouts in it, plus the cutout for the recessed medicine cabinet. Dave and that DVD I borrowed from the library taught me how to properly measure and cut holes. The finished product is far superior to the work we did in the kitchen two years ago! Check out the tight fit on those receptacles and plumbing supplies. Woo hoo!

The boards in the bathroom are almost done and then we'll finish off the new office. Hopefully Dave will have some free time to do the taping and mudding, although his schedule is pretty full with music gigs and other jobs. We just may be tiling before December!!! Imagine that.

Saturday, November 8, 2008

Let there be light!

For two weeks we have been at the electrical stage of the reno. We already pulled the wires in preparation, set them in the correct rooms, and planned the electrical layout. We need six receptacles (one GFCI), one recessed shower light, three overhead lights, one over mirror light, one exhaust fan, one TV/internet cable jack, one telephone jack and several switches to control it all. (We ran the wire for the floor heating, but we won't be installing that for some time.) I've refreshed my electrical knowledge with some books from the library, but the biggest challenge has been figuring out how to use a vapour barrier with recessed lights in a flat ceiling -- mixed messages!

For some reason, I thought that we could do all this in one Sunday. But now, as I write the list of work in prose form, it does seem like a lot. On a schematic, it seemed more straight forward.

Two weeks ago, I was thrilled when I installed a GFCI receptical which would protect all the other fixtures in the bathroom. The highlight of last weekend was getting showered with ashphault soot when pulling cables for the overhead lights and switches. It seems that when the roofers replaced the flat roof 3 years ago, the ashphault sifted through the roof boards and has been sitting on the insulation all this time. When we shifted anything in the ceiling, soot rained down on us. I was wearing safety glasses and a mask, but my face still got pretty dirty (see photo). Although I cheered up when I was able to wire the overhead fixtures.

But, there is never enough time! I still didn't get the new bedroom wired until today. We sealed the plumbing stack and window sill, and replaced 95% of the ceiling insulation. Tomorrow we hope to get the vapour barrier up and everything ready for drywall.

We were prepared to call in a pro for the drywalling, but he called today to say that he's too busy to do our job. If you know anybody, let me know. Otherwise, we're gonna try it ourselves next weekend. Wish us luck--we're going to need it!!!

Thursday, October 16, 2008

Keeping up with Robomike

I know that my brother-in-law Mike thinks that I'm crazy. We are exact opposites in many ways. He hates city life, can't understand why we paid so much for such a small house, and is baffled that I would consider a month in China a vacation. But, when I asked him to "help" me replace the subfloor and put up some framing in our old bathroom, he didn't hesitate. I would like to learn how to frame a wall myself, so I wanted to be involved. I have written about Mike before: he's a man of few words but many skills. He arrived at our house on Tuesday morning, just after Dan left for his first day on his new job. I decided to use a few of my vacation days for my reno-vacation, if only to buy the supplies at the store and help carry stuff in and out of the house. I grew up on a farm and I don't have any brothers, so I was raised to pitch in on any job. Nobody in my house was too small, too young or too female to help out.

When Mike arrived, I showed him the scene. He looked around, shook his head and said: "you've got a lot of work to do here". But, he got to work taking measurements and we were off to Downtown Lumber for our first of many trips. As we were struggling to get a 4' x 8' sheet of 3/4" plywood up the winding stairs in our narrow house, I'm sure he was shaking his head again, although I couldn't see him through the plywood. I had to take the oil paintings that his 11 year old daughter painted for me off the wall, so that we could swing that sheet, tilt it, and get it up the stairs. Thank god the ceilings are 10' high in here!

We only had two days to replace the floor, frame some walls and install the bathtub, because we both had to go to work on Thursday. He was determined to get it done so that we could have the plumber in again on Saturday allowing us to start bathing at home again. I appreciate his determined work ethic and agreed that I would not talk too much, nor try to hug him. For all of our differences, I think that we got along well. But keeping up with Robomike was tough! He didn't eat all day, he barely drank any water, didn't pause at all, nor did he complain. I did my best to keep up, but after three days of hauling junk out of this bathroom, I was starting to wear out at 3 p.m. But, I keep dragging my butt until 9 p.m., although I did take several breaks.

By the end of the 2nd day, we had two walls and two doorways framed. We are renovating our oversized bathroom back to its original bathroom with small bedroom. When Dan returned from work, he helped Mike carry the new bathtub upstairs, and finally the rooms are taking shape. The drills are moving forward now. But, as Mike said, there's still lots of work to do! (And lots to write about.) Mike ate a tiny bit of food, drank a thimble full of water, filled his truck with the rubble from our front porch and drove off into the night. Who was that masked robot? He looked like Mike, but he didn't seem human.

Once again, thank you Mike. These words seem insufficient, but I am truly grateful for your dedication to your work and your family. And I promise that I will never try to hug you.

Monday, October 13, 2008

Pulling Cable

We spent our long weekend hauling crap out of the room that was once a bathroom. It has been two weeks, and yet the power drill is still running in reverse. When will we be putting it in forward and actually building a bathroom, not demolishing one?

We spent Friday night at the holy trinity for home renovators: Home Hardware, Rona and Home Depot. I bought myself an electrician's fishing tape - hooray. I've always wanted one. And today, I needed it, as we fed the four different gauges of wire thru the bulkhead down to the basement and to the panel. (We didn't connect it. We'll get an electrician to do that part.)

Thinking ahead, I want our new bedroom/office to be wired with coaxial cable and phone, plus we are putting a laundry rough-in as well, in the event that we move the laundry upstairs for our golden years. So this required pulling two electrical cables: a 14/2 for the washing machine and 10/3 30A cable for the dryer. That flipping 10/3 cable (the orange stuff) is heavy and expensive! Plus, the future dryer location is as far from the electrical panel that you can get with our tiny house, so we needed a lot of it. This was what I had listed as our easy job for the weekend. Relatively clean and quiet work, yet it still took us a few hours. But, I got to use my new fishing tape, and it worked like a charm.

The harder job was tearing up the remainder of the 3/4" plywood subfloor. It was a loud and dirty job, which I'm sure was even less pleasant for our neighbours. Just pepper the roar of the power saw with some colourful cursing when the head of one of the several screws popped off. The quote of the weekend came from Dan when he said: "drywall comes down a lot faster than it goes up".

After two weeks of toiling in this zone, I'm sure that Dan is happy to be starting his new job tomorrow. He's off the hook for a few day. My super brother-in-law is swooping in tomorrow to save us from this hole that we are in. Super Mike to the rescue!

Monday, October 6, 2008

Renovation is not a dinner party

Chairman Mao famously said: Revolution is not a dinner party. Well last night during a candle-lit dinner party on upper Montrose, I proposed that we should make t-shirts of Chairman Mao holding a reciprocating saw with the tagline: Renovation is not a dinner party. Of course, we thought this was brilliant, but how many t-shirt wearing, renovating sinophiles are there, other than me, of course?

Well, cottage industry aside, it was time to get the floor out today. I was supposed to be off at the end of the week, but asked my kind boss this morning if I could switch with today so that I could help Dan (somebody has to remove the wiring), and my kind boss said yes! So I was free to make dozens of trips up and down the stairs with heavy loads of rubble to the almost full Rhino Bag decorating our front lawn.

After a few pilot drills, we realized that the two layers of subfloor were both 5/8" thick. Many of the screws would not come out or were hidden by tile grout. We had torn out our kitchen floor with relative ease just two years ago, so as always, I underestimated how difficult this would be. I guess that if I thought it would be hard, I wouldn't take it on. It's like some women with childbirth: they know it is going to be difficult, but they do it anyway. I guess the new bathroom is like my baby. I just hope that it doesn't take 9 months!

After several passes with the circular saw, and many hours later, we had an opening 16" across and about 24" long. It allowed us to see the ceiling below and the bulkhead in the kitchen, where all the plumbing passes. After about 30 minutes of gawking at the damage and admiring how strong and sturdy the existing floor is, we thought that we should leave it at that and let the plumber tell us if he needed more floor removed. It was time to walk up the street for a shower and to vote at the advance polls. I may be a sinophile, but I also enjoy the benefits of democracy, so it was my honour to exercise my civic duty.

I think that Chairman Mao would have been proud of my three days of hard labour. It has certainly reformed my thoughts about civil society, but I had the luxury of a hot shower at the end of the day, after a short march north, so it wasn't really that much of a revolution -- just the start of a long renovation.

Sunday, October 5, 2008

Bathroom renovation begins


Dan starts a new job after Thanksgiving and had a miraculous two weeks off. I thought that we should celebrate with either a trip to New York, or by renovating our over-sized and hideous bathroom. For better or worse, we have chosen the more expensive but more permanent option: the bathroom. New York will always be there, right?

A few years ago we made a temporary fix by removing the wallpaper and giving it a neutral coat of white paint, but we just couldn't get beyond that pink tub and toilet, the waste of space and the fact that the shower dribbled like a water pick. The whole room was disappointing. This is our time for revenge.

Our main bathroom is possibly the largest room in our tiny house. It is the same size as our kitchen and main floor 2 piece bathroom. It was originally a tiny bedroom and a tiny bathroom. Alas, we are going to undo that modification and return it to it's original configuration, but hopefully it will be much nicer.

We started last week by removing the closet and cupboards. Dan began chipping away at the ceramic floor tiles on Wednesday and Thursday, and finally finished this hideous task by Saturday. We bought a Rhino Bag from Home Hardware and put it on our front yard and started to fill it with debris. Any usable pieces were re-gifted to strangers on Craigslist. (Will somebody really want that giant pink bathtub?) Things were looking pretty bare on Saturday night when we used the pink shower for the final time. A little bit more water pressure would have helped my aching muscles, but why would it change now? People and bathrooms do not change.

With this giant task complete, all we had to do on Sunday was remove the fixtures and then tear up the subfloor. We got an early start, but like most things, I underestimated how time consuming these tasks would be. I spent about 30 minutes laying under the toilet as rusty water dripped on my head, trying to loosen the tank bolt. Finally we decided to leave the damn tank on, and Dan carried the whole thing out and placed it proudly on our front porch. A few hours later, we brought the sink/vanity outside as well. I checked my email and somebody had responded to my craigslist posting and wanted all three pieces. Hooray. We had to have the tub out by 6 p.m. because that was when they were coming. This led to the video at the top of the posting, where Dan smashed the hell out of the tiles while I cowered by the windows, and pieces of shattered tile flew through the air. (We both had our safety glasses on.) I got into the action as well. I took my turn with the hammer, and pulled down quite a few pieces of cement board covered in tiles, but we just didn't get any photos of this.

A pink fiberglass bathtub that measures 70.5"x35" is not that heavy, but it is very awkward. We called our good friend Matthew in a panic to see if he could help get it down the stairs, but luckily for him, he was on Highway 407 at the time, and with the new owners coming soon, we had to do it ourselves. Surprisingly, it only took us a few minutes to negotiate it down the steep stairs and over the hand railing, to the front porch, where we leaned it against my bike.

Now it was time to cap the copper pipes so that we could turn the water back on. There are now showers in our house now, but we do enjoy the simple pleasures like washing our hands, or a cool glass of water. Renovators cannot live on beer alone, can they? I pulled out my "plumbing shoe box" of tools and accessories from the course that I took back in 2005 at Central Tech. With an aluminum cookie sheet as a shield, I fired up the torch and managed two good solders on my first try. I was as pleased as Dan when he finished the floor tiles.

Alas, we had run out of time for the day and the floor would have to be done by Dan the next day. So off we went to dinner & showers on Upper Montrose, a civilized way to end a busy renovating weekend. It's not quite New York, but still very nice.

Thursday, July 31, 2008

There's no place like Holmes

You may have seen it on TV, but tonight, I saw it in person: the house that Mike Holmes built in his special two hour show, Lein On Me. It just happens that the homeowner is a colleague of mine, and during our United Way fundraising campaign, she auctioned off a tour of her house. Myself and two colleagues were the highest bidders, which allowed us and our significant others to take a behind-the-scenes tour of this amazingly modern eco home. We got to ride in the elevator to the green roof, see the two solar systems, and the awe inspiring 1" copper plumbing that feeds the flexible water supply system. (I can only imagine what their water pressure must be like!!!)

I must admit that I'd never watched Holmes on Homes until the day after I bought this money pit. Three years ago, I was living in a condo, and the whole HGTV network had no appeal to me. The biggest repair jobs that I did there in 5.5 years was replace the toilet flapper and re-tape the dryer vent hose. But the day after I signed that agreement of purchase and sale on a very old house, I switched over to channel 46 for the first time. We both sat silently on the couch watching Mike Holmes discover appalling construction errors and then swoop in like a super hero and "make it right". When I closed my eyes that night, all that I could see was a black hole sucking up all my savings and future earnings. The $400 we paid on a home inspection gave me little comfort. I felt like Jimmy Stewart in Vertigo -- a swirl of worry about the roof, the foundation, the wiring, the plumbing, ...you name it. The more that I watched the show, the more terrified I got. The more scared I was, the more I had to watch. My only salvation was to watch Holmes on Homes -- like a train wreck, I couldn't look away.

Sometimes Mike Holmes comes off as a bit too self-righteous on TV, although I'm glad to see that somebody is there to help homeowners like Christina & Joe. They have been through a tremendous ordeal, and while they are now the proud owners of an amazingly modern brand new home, being homeless for four years has taken its toll on them and their family. Being there and seeing it first hand, I was amazed by the design, architecture, and technology. I'm jealous of the environmental features and the amazing plumbing system that they have. But, I'm glad that my tiny little money pit has not revealed any of the problems that they've seen. I hope that if I meet Mike Holmes that it will be at a book signing or a cocktail party. But seeing his work in person was really fascinating.

To see photos and learn more about the house that Holmes built, visit the website. Or if you're one of my contacts on Flickr, you can see my photos there.

Wednesday, October 24, 2007

It's always good to take a look back now and then











It is easy to get down on yourself, thinking that you haven't done enough to your house. But take a look back at some old photos and you'll see the impressive transformation. Take for example, the front hall, which is now part of the living room.

Mint green paint, knotty pine wainscotting, and DARK. We tried to lighten it up with paint, but that wasn't enough. So we tore down the wall, drywalled the stucco ceiling, some fresh paint, and voila... a room that you can live in!

Now I don't feel so bad that I haven't finished painting the kitchen yet!







The pink did not stop on the main floor. It continued up the stairs and into the hallway, bathroom & "master" bedroom. We removed the "rushing rivers" mural on the closet doors, pulled down the pink pinstripe curtains & burgundy mini blinds, and then gave it a couple of coats of paint. The old futon looks pretty shabby in this photo. It is a work in progress-the room is not done yet.

Wednesday, February 21, 2007

Grouting: It is like learning the Cadbury Caramilk secret

I previously looked at tiled surfaces with very little interest. I had no idea what grout was or how it was placed so neatly into the spaces between all the tiles. Was it put on when you install the tiles to keep them evenly spaced, or was it just the extra adhesive stuff that oozes out when placing the tiles? Well, I can tell you that finally learning the grout mystery is akin to learning how Cadbury gets the caramel into the Caramilk bar - enlightening but trival.

My friend the internet taught me how to grout. I purchased the powdered grout and mixed it up in my own kitchen, then spread it on to fill the spaces using a basic tool called the "grout float", which is nothing more than a rectangle with a handle. Then you wipe off the excess with a damp sponge and wait for it to dry. Yes, it is that easy. But, it is time consuming, as my 24 square feet of glass mosaic tile represents 3,456 individual tiles. So we had to smear the grout between all 3,456 tiles and then wipe each one off a few times, to make sure that the grout does not ruin the sparkly appearance. I must say we because Dan got into it pretty heavy with the grout float, ensuing that each and every crevace was filled, giving himself with a nasty blister.

So with that mystery solved, I decided to ask my all-knowing friend the internet what it knows about the Cadbury Caramilk secret. Alas, I found a posting from 1996 with a simple yet cool animation and full explanation that unlocks the mystery, and has a wonderful artist's rendering of a Mikrovert ™ chocolate shell moulding plant. This is all very cool but it would be better if I could do it myself, like grouting. Now since the Cadbury plant is only a few blocks west of us, and our neighbour's son works there, maybe a trip to the factory is not really beyond grasp. But will they let me put the caramel into the chocolate shells myself? Doubtful.

Sunday, February 11, 2007

Installing Glass Mosaic Tiles

Step 1: Buy 50 lbs of white thin-set and 9.48 litres of mortar admix, because that is the smallest quantity that you can buy it in. (This will cover 120 square feet - we are covering 24 square feet. I think we'll have a bit left over if anybody needs some!)

Step 2: Measure the amount of powder thin-set that you think you'll need by weighing it on your bathroom scale. (We opted for 10 lbs.)

Step 3: Put on your dust mask, goggles and rubber gloves, pour the toxic liquid admix into the power and stir like mad. Avoid inhaling deeply. (note: goggles provide better protection when they are over your eyes, not your hair!)

Step 4: Using a putty knife, smear the thin-set onto the wall where the first tile should go. Using a v-notched trowel, scrape the thin-set so that it creates ridges.

Step 5: Try to steady your shaking hands while you grasp one of the 12x12 tile sheets (that's 144 little tiny tiles per sheet) and place it on the designated spot. Slide it gently to get it level both horizontally and vertically. Press it down gently so that each little tile makes contact, but not too much so that the thin-set oozes between the tiles. (Thin-set between tiles is bad, because that is where your grout is supposed to go.)

Step 6: Repeat steps 4 and 5 until the surface is covered in tiles. Use tiny plastic spacers in attempt to keep the sheets uniformly spaced and level.

Step 7: Throw out the remaining thin-set before it hardens in your bucket. Wash off your brand new counter top and sink, removing all the stray thin-set, and wash all your trowels and tools.

Step 8: Marvel at how good it all looks while enjoying a victory beer. Worry about the next step, when you have to peel the plastic layer off the surface of the tiles without pulling the tiles off the wall (but do not attempt this for several days, when you believe that the tiles are permanently adhered to the wall). Also worry about the upcoming grouting process.

For detailed instructions, read this website. This is where I learned everything that I know about glass mosaic tiles.

Monday, December 25, 2006

All We Want For Christmas...

Installing an over the range microwave/fan seems like it should be easy enough. I read over the instructions twice. I assembled together all the necessary tools. We were ready to go. Over a month ago, I had an electrician run a dedicated wire from the panel to the correct spot in the wall. I bought the necessary supplies at the hardware store and put in the outlet at the correct spot. We cut a hole in the back of the upper cabinet for the outlet. We taped the template to the wall and cabinet to drill holes as described. The harder part is finding studs for the metal bracket to be afixed to. (Is there a stud finder that really works?)

The range hood ships as a top vent, so we had to convert it to back venting. This involved some sort of vent adaptor to be attached with two screws that were not included in the kit. 1:45 p.m. on Christmas Eve, I head out on my bike looking for two #4-10mm screws. We had started our day at Home Depot getting hinges and cupboard doors, and I just didn't want to drive up there again for two tiny screws. Five hardware stores later, I had found the screws -- no charge. (Three stores were closed, one didn't have them.) I picked up some veggies in Kensington market and was home about an hour later, only to discover that they were the WRONG screws. So, we jammed in some that were closer to what we needed, and everything seems fine. But at 4 p.m. we realized that we needed a toggle bolt for the upper cabinet, so we are stuck with the microwave still off the wall, as there wasn't time for another hardware store trip.


For christmas morning, we cleared away most of the power tools to whip up some waffles with fresh strawberries and some coffee. Yum. Sadly, the new dishwasher (pictured here, behind the white chair) is not yet installed, so I had to schlep the dishes downstairs and wash them up in a red plastic bucket. Good exercise, I guess.

Just think how much fun the plumbing for the sink and dishwasher will be, if the microwave is proving to be this much of a challenge. Too bad that Santa doesn't deliver gifts to big kids too.

Friday, December 15, 2006

Kitchen Unplugged

For some reason, the Nirvana unplugged album seems to stick most in my memory, but it seems that every musical performer gets into this style at one point or another. Sadly, Kitchen is not a new band. It is our woeful kitchen. Unplugged for 26 days now. Well, the stove that is. And the sink. And what is a kitchen without running water and the cooking machine? It is just another room. In our case, a room that looks like a tool shed.

Last Saturday, after the sub floor was replaced, Dan was so excited about the return of the stove that he took a pork tenderloin out of the freezer. He did not realize that we needed to finish the drywall first, or else we'd be pulling it out again and again. Tired of the takeout food scene of late, last night he pulled together a gourmet feast of glazed pork tenderloin with green beans - cooked in the toaster over & microwave. The carving was done amongst the tape measures & tools, on top of the new dishwasher box. And since that newest appliance is also still unplugged, I took the dishes into the basement and washed them in the laundry sink. I know that I'm not the first, nor the last to do this, but it still makes me laugh.

I have to say that I'm quite pleased with the drywall project so far. It did take a considerable amount of time for us to do all the cutouts for the plumbing & electrical stuff, but they fit together well in the end. As for the taping & mudding: it wasn't that bad. The green plastic tools that Matthew lent me, along with the tape & mud, plus the instructions that I read on the internet - it all worked fine. Dan did have to make a late night dash to Canadian Tire buy more mud. The biggest surprise was the amount of mud reqired for the job. Maybe I used too much and have a hellish amount of sanding to do. Hopefully not. Tomorrow morning is operation sanding. Can't wait to get that dust all over the house again. But even more exciting is that very soon, our stove will no longer be unplugged. Another leap forward in this crazy project.