For some reason, I thought that we could do all this in one Sunday. But now, as I write the list of work in prose form, it does seem like a lot. On a schematic, it seemed more straight forward.
Two weeks ago, I was thrilled when I installed a GFCI receptical which would protect all the other fixtures in the bathroom. The highlight of last weekend was getting showered with ashphault soot when pulling cables for the overhead lights and switches. It seems that when the roofers replaced the flat roof 3 years ago, the ashphault sifted through the roof boards and has been sitting on the insulation all this time. When we shifted anything in the ceiling, soot rained down on us. I was wearing safety glasses and a mask, but my face still got pretty dirty (see photo). Although I cheered up when I was able to wire the overhead fixtures.
But, there is never enough time! I still didn't get the new bedroom wired until today. We sealed the plumbing stack and window sill, and replaced 95% of the ceiling insulation. Tomorrow we hope to get the vapour barrier up and everything ready for drywall.
We were prepared to call in a pro for the drywalling, but he called today to say that he's too busy to do our job. If you know anybody, let me know. Otherwise, we're gonna try it ourselves next weekend. Wish us luck--we're going to need it!!!
